The  Day  the  Dam  Burst
                                                "even  when  dry,  was  o.f  deci~edly  inferior
        UNIQUE  strength and  .  .  .  when wet,  beoame so so.ft
                                                that most o.f  it lost almost all rock character-
                                                istics."  The  probers  concluded  that  "the
                                                ultimate failure  of  this  dam  was  inevitable,
                                                unless  water  could  have  been  kept  from
                                                reaching  the foundation."
                                                  Instead, they found,  water had percolated
                                                into  and  through  the  area where  the  schist
                                                and  conglomerate met,  "with resulting  soft-
                                                ening  of the  conglomerate  under  the  dam."
                                                  No  eyewitness  of  the  actual  break,  if
                                                there  was  any,  lived  to  tell  what  he  saw,
                                                but Gov.  Youf1g's  investigators  were certain
                                                that  they  knew  what  had  happened:
                                                  "Either  a  blowout  under,  or  a  settling
                                              '  of  the  concrete  at, this  place,  or  both,  oc-
                                                curred,  quickly  followed  by  the  collapse
                                                of  large  s:ections  of  the  dam."
                                                  The  commission  had  one  conclusion  of
                                                overriding  importance:  "The  failure  of  this
                                                dam  indicates  the  desirability  of  -having
                                                all  such  sb·uctures  erected  and  maintained
        A  perfect  seedbed                     under  the  supervision  and  control  of  state
                                                authorities."
                                                  The  next  session  of  the  legislature  wrote
        in  one  easy                           the  decision  into  California  law.  Never
        operation-yours                         again  would  one  individual  be  the  final
                                                authority  on  the  safety  of  any  dam  of  im-
                                                portance.  This  legal  attitude  became  uni-
        only  from  GRAVELY                     versal in the  United States.
                                                  In  addition,  engineering  geologists  are
         Easy!  Frnish  plowing,  start  planting.   now on every major dam-building staff,  and
         Powerful 4-blade Rotary Plow pulverizes   practical  geology  is  part  of  every . civil
         soil, leaves it ready for  planting.   engineer's  college  curriculum.
          And after your garden's in,  power cul-  "If  the  St.  Francis  Dam  were  to  be  re-
         tivate  all  season  long  with  Gravely's   built  today,"  a  California  engineer told me,
                                                "it would probably be an embankment dam,
         Rotary  Cultivator  ... aerates  soil  thor-  not  a  gravity  dam.  That  would  spread  the
         roughly,  completely.  Both  among  31   base  over  a  much  greater  area  and  very
                       year-round -use  attach-  much  lighten  the  unit  load  on  the  founda-
                       ments  for  the  all-gear   tion.  Putting  a  gravity  dam  there  was
                       drive Gravely Tractor . ..   rather  like  resting  a  woman's  full  weight
                       now  available  with     on  a  spike  heel."
       Free  booklet · ··  standard 4·-speed or new   Bet  d1e  St.  Francis  Dam  has  never  been
                       "Swiftamatic"  8-speed   rebuilt,  though  Power  Plant  No.  2  rose
                       transmission.            again  just  where  it  first  stood.
                                                  San  Francisquito  Canyon  is  silent  as  a
                         Check  the  Yellow     cemetery  at  the  old  dam  site  today.  Ap-
                       Pages  for  your  nearby   propriately so,  for  it still contains  memorials
                       Gravely  dealer  ... see   to  the  disaster  that  occurred  there  36 years
                       him soon.                ago.  The  dry  stream  bed  is  littered  with
                                                rounded  fragments  of  concrete.  Protruding
       GRAVELY                                  ends  of  reinforcing rods,  twisted like  string,
                                                testify  to  the  terrible  strength  of the  water
                                                that  hurled  them  there  on  that  long-ago
       5903 Gravely  Lane,  Dunbar, W. Va.  25064   night  in  March.           •  •
       182  POPULAR  SCIENCE  MARCH  1964
   2   3   4   5   6   7